Continuity, backup and recovery
Technical continuity principles without publishing RPO, RTO or SLA values that have not been formally approved.
How to interpret this document
This content describes technical and methodological behavior that is implemented or explicitly planned in the product. When a control depends on configuration, a provider, a secret, a contract or legal approval, that dependency must remain visible.
Current state
The application has code checkpoints, rollback runbooks, readiness gates and operational evidence. These support recovery but do not equal a certified disaster-recovery program or contractual SLA.
Recovery priority
During an incident, restore authentication, authorization, data integrity, critical functions and observability first. Secondary capabilities can remain degraded while consistency is confirmed.
Preservation
Rollback should not erase audit, billing, identity or telemetry evidence required to investigate the incident.
Post-recovery validation
After restoration, run health checks, integrity checks, reconciliation and GLR-1.0 before expanding rollout again.
RPO/RTO
No standard public RPO or RTO is declared today. Contractual values require infrastructure validation, operational ownership and commercial/legal approval.